CorrBoard Bioenergy (CB Bio) has invested £5.5m in building a sustainable energy generation facility fuelled by organic waste to power the manufacture of corrugated sheet board.
CB Bio is a joint venture between packaging and display trade specialist Swanline Group and paper-based packaging producer McLaren Packaging.
The CB Bio Scunthorpe facility, which can be operated remotely to maximise uptime, will produce carbon-neutral corrugated material for use at Swanline and McLaren’s manufacturing plants in Staffordshire and Port Glasgow.
It has the capacity to divert 25,000 tonnes of biological waste from landfill.
READ ARTICLE